![]() ![]() I have two routes that I can take to work / home. I just did it to get a cool icon but no one knew that it was so it was a waste of time. It wasn't complicated to connect dots but you'd have thought it was rocket science. You had to just tolerate it otherwise they wouldn't finish your connections you'd get suspended for "not finishing your work". The slack channel was nothing but assholery of the high levels shitting on the lower levels. So the upper level would hyper analyze their work and be like you're off by 1 degree and you should fix the last 5,000 edits because they make me unhappy. They'd have to ask a 3,4,5 to do it as they couldn't. What would happen is a level one or two would edit a neighborhood and then at the end of the street they'd have to connect the side road to a main road. Level 5 could do anything including real time construction edits on interstates etc. Level 4 could do major streets and highways. Level two was like 20,000 edits but you could edit most streets just not critical streets major intersections or the area around a hospital. I don't know how it is now but at the time the map edits were done by actual people. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |